OSHA 30 Construction Practice Test (Adaptive Mock)
The OSHA 30-Hour Construction course goes deeper than OSHA 10 and is aimed at supervisors. These questions follow the federal construction standards in 29 CFR 1926. Each attempt draws 15–20 questions and adapts to your last score.
Adaptive Practice Test
15–20 Questions Drawn From 201
Every attempt is a new test: questions are drawn at random and the answer order is shuffled. Score 80% or more and your next test moves up a level; score under 50% and it eases back. Your level is saved only in this browser.
Your Level Foundation
How This Practice Test Works
- Each attempt draws 15–20 questions at random from our pool of 201 and shuffles the answer order. Score 80% or more and the next test moves up a difficulty level; under 50% and it eases back.
- After every answer you see an explanation and the 29 CFR 1926 reference behind it.
- We use 70% as a practice target. Authorised outreach trainers and online providers set their own quizzes; OSHA does not publish an exam bank.
- There is no sign-up. Your level is saved only in this browser.
These are original questions written by our editorial team from the published 29 CFR 1926. They are not real exam questions. Each question cites the 29 CFR section behind the answer. OSHA does not endorse Trade Exam Hub, and outreach cards come only from authorised trainers.
What the Question Pool Covers
Every question cites the rule behind its answer. Counting those references shows where the pool puts its weight:
| Reference | Questions |
|---|---|
| 29 CFR 1926.1202 | 7 |
| 29 CFR 1926.250(b) | 5 |
| 29 CFR 1926.350(a) | 3 |
| 29 CFR 1926.701(b) | 2 |
| 29 CFR 1926.754(b) | 2 |
| 29 CFR 1926.1427 | 2 |
| 29 CFR 1926.1431 | 2 |
| 29 CFR 1926.251(a) | 2 |
| 29 CFR 1926.302(b) | 2 |
| 29 CFR 1926.304(b) | 2 |
| 29 CFR 1926.1052(c) | 2 |
| 29 CFR 1904.39 | 2 |
| 29 CFR 1926.404(b)(1)(iii) | 2 |
| 29 CFR 1926.1153 Table 1 | 2 |
| 29 CFR 1926.150(c)(1)(i) | 2 |
| 29 CFR 1926.102(a)(2) | 2 |
| OSHA safety rules | 1 |
| 29 CFR 1926.1204 | 1 |
| 29 CFR 1926.701(d) | 1 |
| 29 CFR 1926.701(c) | 1 |
| 29 CFR 1926.701(a) | 1 |
| 29 CFR 1926.701(f) | 1 |
| 29 CFR 1926.760(a) | 1 |
| 29 CFR 1926.760(b) | 1 |
| 29 CFR 1926.760(c) | 1 |
| 29 CFR 1926.350(d) | 1 |
| 29 CFR 1926.350(f) | 1 |
| 29 CFR 1926.351(b) | 1 |
| 29 CFR 1926.1424 | 1 |
| 29 CFR 1926.251(c) | 1 |
| 29 CFR 1926.300(d) | 1 |
| 29 CFR 1926.300(b) | 1 |
| 29 CFR 1926.1052(a) | 1 |
| 29 CFR 1926.62(c) | 1 |
| 29 CFR 1926.62(b) | 1 |
| 29 CFR 1926.62(j) | 1 |
| 29 CFR 1926.21(b) | 1 |
| 29 CFR 1926.20(b) | 1 |
| 29 CFR 1926.25(a) | 1 |
| 29 CFR 1926.34 | 1 |
| 29 CFR 1926.1153 | 1 |
| 29 CFR 1926.1153(g) | 1 |
| 29 CFR 1926.652(a) | 1 |
| 29 CFR 1926 Subpart P | 1 |
| 29 CFR 1926.502(d) | 1 |
| 29 CFR 1926.451(g) | 1 |
| 29 CFR 1926.52 | 1 |
| 29 CFR 1926.150(c) | 1 |
| 29 CFR 1926.502(d)(16)(ii) | 1 |
| 29 CFR 1926.502(d)(16)(iv) | 1 |
| 29 CFR 1926.502(d)(16)(iii) | 1 |
| 29 CFR 1926.502(d)(3) | 1 |
| 29 CFR 1926.502(d)(4) | 1 |
| 29 CFR 1926.502(d)(12) | 1 |
| 29 CFR 1926.502(d)(13) | 1 |
| 29 CFR 1926.502(c)(1) | 1 |
| 29 CFR 1926.502(c)(7) | 1 |
| 29 CFR 1926.502(c)(4)(i) | 1 |
| 29 CFR 1926.502(c)(8) | 1 |
| 29 CFR 1926.502(e)(2) | 1 |
| 29 CFR 1926.502(f)(1)(ii) | 1 |
| 29 CFR 1926.502(f)(2)(ii) | 1 |
| 29 CFR 1926.502(f)(2)(iii) | 1 |
| 29 CFR 1926.502(g)(1)(i) | 1 |
| 29 CFR 1926.502(g)(2)(i) | 1 |
| 29 CFR 1926.502(g)(3)(iii) | 1 |
| 29 CFR 1926.502(j)(2) | 1 |
| 29 CFR 1926.502(j)(3) | 1 |
| 29 CFR 1926.502(j)(6)(i) | 1 |
| 29 CFR 1926.502(b)(5) | 1 |
| 29 CFR 1926.502(d)(10)(ii) | 1 |
| 29 CFR 1926.451(a)(3) | 1 |
| 29 CFR 1926.451(a)(5) | 1 |
| 29 CFR 1926.451(b)(2) | 1 |
| 29 CFR 1926.451(b)(2)(i) | 1 |
| 29 CFR 1926.451(b)(3) | 1 |
| 29 CFR 1926.451(b)(3)(ii) | 1 |
| 29 CFR 1926.451(b)(4) | 1 |
| 29 CFR 1926.451(b)(7) | 1 |
| 29 CFR 1926.451(c)(1)(ii) | 1 |
| 29 CFR 1926.451(e)(2)(ii) | 1 |
| 29 CFR 1926.451(e)(2)(iii) | 1 |
| 29 CFR 1926.451(e)(8) | 1 |
| 29 CFR 1926.451(e)(6)(i) | 1 |
| 29 CFR 1926.451(e)(6)(ii) | 1 |
| 29 CFR 1926.451(g)(4)(ii) | 1 |
| 29 CFR 1926.451(g)(4)(vi) | 1 |
| 29 CFR 1926.451(e)(4)(xi) | 1 |
| 29 CFR 1926.451(f)(6)(ii) | 1 |
| 29 CFR 1926.451(d)(1) | 1 |
| 29 CFR 1926.1053(a)(3)(i) | 1 |
| 29 CFR 1926.1053(a)(3)(ii) | 1 |
| 29 CFR 1926.1053(a)(4)(ii) | 1 |
| 29 CFR 1926.1053(a)(13) | 1 |
| 29 CFR 1926.1053(a)(19) | 1 |
| 29 CFR 1926.1053(a)(22)(iii) | 1 |
| 29 CFR 1926.1053(a)(24) | 1 |
| 29 CFR 1926.1053(a)(1)(iii) | 1 |
| 29 CFR 1926.1053(a)(1)(i) | 1 |
| 29 CFR 1926.1052(a)(4) | 1 |
| 29 CFR 1926.1052(c)(6) | 1 |
| 29 CFR 1926.1052(c)(5) | 1 |
| 29 CFR 1926.1052(c)(11) | 1 |
| 29 CFR 1926.1052(c)(3)(iv) | 1 |
| 29 CFR 1926.651(c)(2) | 1 |
| 29 CFR 1926.651(g)(1)(iii) | 1 |
| 29 CFR 1926.651(l) | 1 |
| 29 CFR 1926.651(b)(2) | 1 |
| 29 CFR 1926.652(b)(1)(i) | 1 |
| 29 CFR 1926.652(g)(2) | 1 |
| 29 CFR 1926.652(a)(1)(i) | 1 |
| 29 CFR 1926.404(c)(1)(ii)(D) | 1 |
| 29 CFR 1926.404(c)(1)(ii)(A) | 1 |
| 29 CFR 1926.404(c)(1)(iii) | 1 |
| 29 CFR 1926.405(a)(2)(ii)(G) | 1 |
| 29 CFR 1926.405(b) | 1 |
| 29 CFR 1926.405(j)(1)(ii) | 1 |
| 29 CFR 1926.405(c)(3)(ii) | 1 |
| 29 CFR 1926.405(a)(2)(iii) | 1 |
| 29 CFR 1926.405(a)(2)(ii)(A) | 1 |
| 29 CFR 1926.1417(s) | 1 |
| 29 CFR 1926.1417(o)(2) | 1 |
| 29 CFR 1926.1431(j)(1) | 1 |
| 29 CFR 1926.1431(n) | 1 |
| 29 CFR 1926.1431(e)(10) | 1 |
| 29 CFR 1926.1431(e)(6) | 1 |
| 29 CFR 1926.1408(a)(2)(ii) | 1 |
| 29 CFR 1926.1408(b)(3) | 1 |
| 29 CFR 1926.151(c)(1) | 1 |
| 29 CFR 1926.151(c)(2) | 1 |
| 29 CFR 1926.151(c)(5) | 1 |
| 29 CFR 1926.151(d)(5) | 1 |
| 29 CFR 1926.151(d)(7) | 1 |
| 29 CFR 1926.62(d)(6) | 1 |
| 29 CFR 1926.62(d)(6)(iii) | 1 |
| 29 CFR 1926.62(j)(2)(iv)(A) | 1 |
| 29 CFR 1926.62(j)(3)(i)(A) | 1 |
| 29 CFR 1926.62(j)(2)(i)(A) | 1 |
| 29 CFR 1926.62(g)(2)(i) | 1 |
| 29 CFR 1926.1101(c)(2) | 1 |
| 29 CFR 1926.1101(g) | 1 |
| 29 CFR 1926.1101(g)(5) | 1 |
| 29 CFR 1926.1101(k)(3)(iii) | 1 |
| 29 CFR 1926.1153(h)(2) | 1 |
| 29 CFR 1926.1153(h)(6)(i) | 1 |
| 29 CFR 1926.1153(c)(1) | 1 |
| 29 CFR 1926.1153(a) | 1 |
| 29 CFR 1926.600(a)(6)(iii) | 1 |
| 29 CFR 1904.39(a)(1) | 1 |
| 29 CFR 1904.39(a)(2) | 1 |
| 29 CFR 1926.350(a)(10) | 1 |
| 29 CFR 1926.350(a)(1) | 1 |
| 29 CFR 1926.350(f)(2) | 1 |
| 29 CFR 1926.352(d) | 1 |
| 29 CFR 1926.150(c)(1)(vi) | 1 |
| 29 CFR 1926.150(c)(1)(ii) | 1 |
| 29 CFR 1926.601(b)(4) | 1 |
| 29 CFR 1926.200(d) | 1 |
| 29 CFR 1926.201(a) | 1 |
| 29 CFR 1926.28(a) | 1 |
| 29 CFR 1926.300(b)(5) | 1 |
| 29 CFR 1926.103 | 1 |
| 29 CFR 1926.703(b)(10) | 1 |
| 29 CFR 1926.760(a)(1) | 1 |
| 29 CFR 1926.760(b)(1) | 1 |
| 29 CFR 1926.760(c)(3) | 1 |
| 29 CFR 1926.760(c)(5) | 1 |
| 29 CFR 1926.754(b)(2) | 1 |
| 29 CFR 1926.754(b)(3) | 1 |
| 29 CFR 1926.1203(d) | 1 |
| 29 CFR 1926.1205(e)(1) | 1 |
| 29 CFR 1926.350(a)(11) | 1 |
| 29 CFR 1926.302(b)(8) | 1 |
| 29 CFR 1926.300(d)(3) | 1 |
| 29 CFR 1926.601(b)(9) | 1 |
| 29 CFR 1926.52(a) | 1 |
Sample Questions With Worked Answers
A few questions from the pool with the answer and explanation, so you can see the style before you start.
Who is the OSHA 30-hour construction course designed for?
Answer: Supervisors and workers with safety responsibility. OSHA describes the 30-hour course as more in-depth training for supervisors and workers with some safety responsibility.
Reference: OSHA Outreach Training Program
Under the confined spaces standard, a confined space is large enough to bodily enter, has limited means of entry or exit, and:
Answer: Is not designed for continuous employee occupancy. 1926.1202 definition.
Reference: 29 CFR 1926.1202
A permit-required confined space has one or more hazards, such as:
Answer: A hazardous atmosphere, engulfment material, a trapping configuration or another serious hazard. 1926.1202 definition of permit space.
Reference: 29 CFR 1926.1202